Administrative Record

IAAAP Administrative Record, required by the Code of Federal Regulations, is a compilation of documents that track the discovery, investigation and remedy selection for environmental clean-up activities. It also provides a mechanism for public participation. The documents contained in the Administrative Record were used as the basis for the selection of a response action. All hard copies of the Administrative Record reside at the installation. For a complete list of every document, download the Administrative Record Index – OCT2019. You can also download a description of the CERCLA Phases.

Operable Unit 1 (OU1) - Soils

1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003

Preliminary Assessments (PA)

100--PA--Installation Assessment--JAN1980
102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices
1000.01--PA--Petroleum Leak Spill Area Final Assessment--MAR1990
1000.1--PA--Replace Upgrade Explosives Collection Sumps Study--DEC1990
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995

Site Inspections (SI)

200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
209--SI--Site Assessment Project Plans--JUN2000
210--SI--Field Sampling Report--FEB2001

Remedial Investigations (RI)

300--RI--Endangerment Assessment Line 1 Impoundment Line 800 Lagoon 1 of 2--JUL1989
300--RI--Endangerment Assessment Line 1 Impoundment Line 800 Lagoon 2 of 2--JUL1989

301--RI--Risk Assessment Protocol--OCT1992
1000.2--RI--Contamination Assessment of Concrete Sumps--JUN1993
1000.3--RI--Engineering Evaluation Cost Analysis-Pesticide Pit Removal--OCT1994
1000.4--RI--Engineering Evaluation Cost Analysis-Explosive Contaminated Sumps--OCT1994
303--RI--Field Sampling Plan Addendum--MAR1995

306--RI--Risk Assessment-1of21-MAY1996
306--RI--Risk Assessment-2of21-MAY1996
306--RI--Risk Assessment-3of21-MAY1996
306--RI--Risk Assessment-4of21-MAY1996
306--RI--Risk Assessment-5of21-MAY1996
306--RI--Risk Assessment-6of21-MAY1996
306--RI--Risk Assessment-7of21-MAY1996
306--RI--Risk Assessment-8of21-MAY1996
306--RI--Risk Assessment-9of21-MAY1996
306--RI--Risk Assessment-10of21-MAY1996
306--RI--Risk Assessment-11of21-MAY1996
306--RI--Risk Assessment-12of21-MAY1996
306--RI--Risk Assessment-13of21-MAY1996
306--RI--Risk Assessment-14of21-MAY1996
306--RI--Risk Assessment-15of21-MAY1996
306--RI--Risk Assessment-16of21-MAY1996
306--RI--Risk Assessment-17of21-MAY1996
306--RI--Risk Assessment-18of21-MAY1996
306--RI--Risk Assessment-19of21-MAY1996
306--RI--Risk Assessment-20of21-MAY1996
306--RI--Risk Assessment-21of21-MAY1996

311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
324--RI--Modification to the SAP Eco Assessment--APR2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
327--RI--Eco Risk Assessment Screening Level--APR2001
330--RI--Bio-remediation Metals Treatment WBPLF Soil Work Plan--JUL2001
332--RI--Development of Dose Est Models and Toxicity Eco--AUG2001

333--RI--Screening Level Risk Assessment Eco-text-appendixA--AUG2001
333--RI--Screening Level Risk Assessment Eco-appendixB-J--AUG2001

337--RI--Bio-remediation Metals Treatment WBPLF Soils Supplemental Work Plan--AUG2001

1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 1-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-2-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-3-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-4-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-5-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-6-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-7-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-8-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites-9-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 10-of-11--SEP2001
1000--RI--Work Plan for Supplemental RI for Line 1 and Firing Sites 11-of-11--SEP2001

338--RI--Addendum to Screening Level Risk Assessment Eco--DEC2001

339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002

342--RI--Technical Memos 1-4 for the Eco Risk Assessment--APR2002
343--RI--Work Plan Addendum Metals Treatment WBPLF Soils--AUG2002

1001--RI--Supplemental RI for Line 1 and Firing Site (text)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (figures)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (tables)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix A-B)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix C)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix D)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix E-F)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix G1)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (appendix G2)--AUG2002
1001--RI--Supplemental RI for Line 1 and Firing Site (RTC)--AUG2002

344--RI--Aerial Radiation Survey Work Plan--OCT2002

1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-1-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-2-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-3-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-4-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-5-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-6-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-7-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-8-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-9-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-10-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-11-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-12-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-13-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-14-of-15--MAR2003
1002--RI--Work Plan for Supplemental RI Phase 4 Soil Sites-15-of-15--MAR2003

346--RI--Aerial Radio-logical Survey--JUL2003

348--RI--Work Plan for UXO Survey LL6 and CTA 1 of 3--MAY2004
348--RI--Work Plan for UXO Survey LL6 and CTA 2 of 3--MAY2004
348--RI--Work Plan for UXO Survey LL6 and CTA 3 of 3--MAY2004

349--RI--Technical Memo 5 BERA--JUL2004

349.1--RI--Soil Data Collection Work Plan 1of2--JUL2004
349.1--RI--Soil Data Collection Work Plan 2of2--JUL2004

1002.1--RI--HRR for L6-800-CTA-Deact Furnace 1of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 2of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 3of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 4of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 5of6--SEP2004
1002.1--RI--HRR for L6-800-CTA-Deact Furnace 6of6--SEP2004

350--RI--BERA-Vol-I-and-II-1of2--OCT2004
350--RI--BERA-Vol-I-and-II-2of2--OCT2004

352--RI--L6-CTA Mec Density Survey Report 1of2--MAY2005
352--RI--L6-CTA Mec Density Survey Report 2of2--MAY2005

353--RI--Soil Data Collection Report 1of6--MAY2005
353--RI--Soil Data Collection Report 2of6--MAY2005
353--RI--Soil Data Collection Report 3of6--MAY2005
353--RI--Soil Data Collection Report 4of6--MAY2005
353--RI--Soil Data Collection Report 5of6--MAY2005
353--RI--Soil Data Collection Report 6of6--MAY2005

1003--RI--Line 7 Post Demo Soil Sampling Work Plan--JAN2006

356--RI--Supplemental RI Work Plan 1of4--MAY2006
356--RI--Supplemental RI Work Plan 2of4--MAY2006
356--RI--Supplemental RI Work Plan 3of4--MAY2006
356--RI--Supplemental RI Work Plan 4of4--MAY2006

357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006

357--RI--Comprehensive Watersheds Evaluation Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 3of3--DEC2006

1004--RI--FUSRAP RI REPORT 1 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 2 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 3 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 4 of 5--JUL2008
1004--RI--FUSRAP RI REPORT 5 of 6--JUL2008
1004--RI--FUSRAP RI REPORT 6 of 6--JUL2008

502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017

Feasibility Study (FS)

400--FS--Soil Focused Feasibility Study--MAY1997
402--RI--Soils Feasibility Study Report--JUN1998

Proposed Plan (PP)

500--PP--Focused Soils Proposed Plan - Applies to IROD--MAY1997
1005--PP--Soils Proposed Plan - Applies to ROD--JUN1998
1005.1--PP--Soils Public Meeting Notice - Applies to ROD--JUN1998
1006--PP--Public Meeting Transcript--JUL1998

Record of Decision (ROD)

1006.1--ROD--Action Memorandum for the Pesticide Pit--MAR1995
1006.2--ROD--Action Memo for Explosive Contaminated Sump Removal--NOV1995
1006.3--ROD--Action Memo for Line 800 Pink Water Lagoon and Line 1 Impoundment--OCT1996
1006.4--ROD--Explanation of Significant Difference and Action Memorandum for the Fire Training Pit--DEC1997
1007--ROD--OU1 Interim Action Record of Decision--MAR1998
1008--ROD--OU1 Record of Decision--AUG1998
1009--ROD--Explanation of Significant Difference for the OU1 Record of Decision--JAN2003
1010--ROD--Explanation of Significant Difference for OU1 IROD--JUN2006
1010.1--ROD--ESD for OU1 IROD--JUN2008
1011--ROD--Public Notice-Alkaline Hydrolysis ESD--AUG2009
1012--ROD--ESD for OU1 ROD--SEP2009
1013--ROD--ESD for OU1 ROD--MAR2011
1014--ROD--Public Notice-ESD-Barium--MAR2011
1045—ROD—OU1 ESD—OCT2018
1046—ROD—Public Notice–OU1 ESD—NOV2018

Operable Unit 3 (OU3) - Offsite Groundwater

1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001

Preliminary Assessments (PA)

102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Contamination Geo-technical Reports (drawings)--SEP1982
111--PA--Technical Review Committee Minutes--MAY1993

Remedial Investigation (RI)

301--RI--Risk Assessment Protocol--OCT1992
3000--RI--Action Memo for Offpost Rathbun Hookup--JUL1993
3001--RI--Public Meeting Transcript for Offpost Rathbun Connection--AU1993

302--RI--BHHERA for Former Line 1 Impoundment and Line 800 Lagoon 1of2--JUN1994
302--RI--BHHERA for Former Line 1 Impoundment and Line 800 Lagoon 2of2--JUN1994

306--RI--Risk Assessment--MAY1996
313--RI--Quality Control Summary Report Supplemental Groundwater RI--JAN1998
321--RI--LTM Events Fall 99-Spring 00 Work Plan Addendum--NOV1999
3002--RI-- Tech Memo Supplemental Investigation for Offsite Groundwater, Surfacewater and Sediment--JAN2000
323--RI--LTM Event Spring 2000 Work Plan Addendum--APR2000
328--RI--Tech Memos Fate and Transport of Contaminants and Evaluation--JUL2001
3003--RI--2001 Action Memo Addendum for Permanent Water--JUL2001
3004--RI--Offsite Groundwater RI Work Plan Addendum--AUG2001

334--RI--Supplemental Groundwater RI Report 1of5--AUG2001
334--RI--Supplemental Groundwater RI Report 2of5--AUG2001
334--RI--Supplemental Groundwater RI Report 3of5--AUG2001
334--RI--Supplemental Groundwater RI Report 4of5--AUG2001
334--RI--Supplemental Groundwater RI Report 5of5--AUG2001

335--RI--Groundwater Monitoring Program--AUG2001
336--RI--Fall 2000 Spring 2001 Groundwater Monitoring Results Summary--AUG2001
340--RI--Facility Wide Work Plan for Groundwater--FEB2002

341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 1of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 2of6--FEB2002.
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 3of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 4of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 5of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 6of6--FEB2002

3005--RI--Offsite Monitoring Well and Staff Gauge Photo Log--DEC2002

347--RI--2002 Groundwater Monitoring Report 1of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 2of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 3of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 4of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 5of5--AUG2003

351--RI--2003 Groundwater Monitoring Report 1of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 2of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 3of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 4of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 5of5--DEC2004

354--RI--2004 Groundwater Monitoring Report 1of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 2of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 3of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 4of4--JUL2005

355--RI--2004-2005 Groundwater Sampling Report 1of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 2of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 3of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 4of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 5of5--DEC2005

357.1--RI--Brush Creek Surface Water and Sediment Investigation Work Plan--FEB2006

357--RI--Comprehensive Watersheds Evaluation Work Plan 1of2--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of2--DEC2006

358--RI--2006GWSamplingReport-1of3--FEB2009
358--RI--2006GWSamplingReport-2of3--FEB2009
358--RI--2006GWSamplingReport-3of3--FEB2009

359--RI--2007GWSamplingReport--FEB2009

3006--RI--Tech Memo for Offsite Brush Creek SW and GW Sampling--FEB2009
3007--RI--Tech Memo for Offsite Brush Creek SW and GW Results--JUN2009

3007.1--RI--Tech Memo for Offsite Brush Creek SW Update--JUN2014

502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017

3030--RI—Site-Specific Worksheets for Operable Unit 3 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018

Feasibility Study (FS)

401--FS--Groundwater Feasibility Study Report--DEC1997

403--FS--Interim Groundwater Feasibility Study Report-1of2--AUG1998
403--FS--Interim Groundwater Feasibility Study Report-2of2--AUG1998

3008--FS--Offsite Groundwater Treatability Study Test Plan--NOV2004

Proposed Plan (PP)

3009--PP--Offsite Groundwater Proposed Plan--JUL2004
3010--PP--Offsite Groundwater Proposed Plan Public Meeting Handouts--JUL2004
3011--PP--Offsite Groundwater Proposed Plan Transcript--JUL2004

Record of Decision (ROD)

3012--Offsite Groundwater Record of Decision--1of2--JUN2005
3012--Offsite Groundwater Record of Decision-2of2--JUN2005

Operable Unit 4 (OU4) - Inert Disposal Area (IDA)

1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001

Preliminary Assessments (PA)

100--PA--Installation Assessment--JAN1980
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995

Site Inspections (SI)

200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
207--SI--Site Characterization Report R12-R21--MAR1993

Remedial Investigations (RI)

301--RI--Risk Assessment Protocol--OCT1992

4000--RI--Inert Landfill Closure Plans 1of3--OCT1994
4000--RI--Inert Landfill Closure Plans 2of3--OCT1994
4000--RI--Inert Landfill Closure Plans 3of3--OCT1994

303--RI--Field Sampling Plan Addendum--MAR1995

304--RI--Engineering Evaluation Cost Analysis for Three Removal Actions 1of2--MAY1995
304--RI--Engineering Evaluation Cost Analysis for Three Removal Actions 2of2--MAY1995

4001--RI--Trench 6 and Trench 7 Asbuilts--AUG1996
305--RI--Implementation Proposal for Environmental Protection--FEB1996
306--RI--Risk Assessment--MAY1996
307--RI--Work Plan for Multiple Removal Actions--AUG1996
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
312--RI--Multiple Removal Actions - Construction Progress Photo--SEP1997
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
324--RI--Modification to the SAP Eco Assessment--APR2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
327--RI--Eco Risk Assessment Screening Level--APR2001
330--RI--Bio-remediation Metals Treatment WBPLF Soil Work Plan--JUL2001
332--RI--Development of Dose Est Models and Toxicity Eco--AUG2001

333--RI--Screening Level Risk Assessment Eco-text-appendixA--AUG2001
333--RI--Screening Level Risk Assessment Eco-appendixB-J--AUG2001

337--RI--Bio-remediation Metals Treatment WBPLF Soils Supplemental Work Plan--AUG2001
338--RI--Addendum to Screening Level Risk Assessment Eco--DEC2001
342--RI--Technical Memos 1-4 for the Eco Risk Assessment--APR2002
343--RI--Work Plan Addendum Metals Treatment WBPLF Soils--AUG2002
349--RI--Technical Memorandum #5 for the BERA--JUL2004

350--RI--BERA Vol I and II 1of2--OCT2004
350--RI--BERA Vol I and II 2of2--OCT2004

357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006

357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation and Supplemental Data Collection Work Plan 3of3--DEC2006

4001.1--RI--Supplemental RI--SEP2009

502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
842--RI—Site Specific Worksheets for the Compliance Cleanup RCRA Sites of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018

Feasibility Study (FS)

4002--FS--Proposal for CAMU Designation--NOV1995
4003--FS--Designation of CAMU--MAR1996
400--FS--Soils Focused Feasibility Study--MAY1997
402--FS--Soils Feasibility Report--JUN1998
4004--FS--IDA Focused Feasibility Study--JAN2007

Proposed Plan (PP)

500--PP-Focused Soils Proposed Plan (Applies to IROD)--MAY1997
4005--PP--IDA Proposed Plan--MAY2007
4006--PP--IDA Proposed Plan Press Release--JUN2007

Record of Decision (ROD)

4006.1--ROD--Action Memorandum for the Inert Landfill--SEP1997
4007--ROD--IDA Interim Action Record of Decision--SEP2008

Operable Unit 5 (OU5) - Military Munitions Response Program (MMRP)

1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.3--ALL--Community Relations Plan Update--SEP2011
5050--MMRP-Public-Notice--NOV2007
5060--MMRP-RIFS-Guidance--NOV2009

Preliminary Assessment (PA)

5000--PA-Closed, Transferring, and Transferred Range Site Inventory Report--OCT2003

Site Inspection (SI)

5001--SI--MMRP Historical Records Review 1of5--JUL2007
5001--SI--MMRP Historical Records Review 2of5--JUL2007
5001--SI--MMRP Historical Records Review 3of5--JUL2007
5001--SI--MMRP Historical Records Review 4of5--JUL2007
5001--SI--MMRP Historical Records Review 5of5--JUL2007

5002--SI--MMRP SI--SEP2007

Remedial Investigation (RI)

348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 1-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 2-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 3-of-3--MAY2004

352--RI--Line 6 and Central Test Area Mec Density Survey Report 1of2--MAY2005
352--RI--Line 6 and Central Test Area Mec Density Survey Report 2of2--MAY2005

5003--RI--MMRP-RI Work Plan 1of2--APR2008
5003--RI--MMRP RI Work Plan 2of2--APR2008

5004--RI--MMRP GPO Plan--JUN2008

5005--RI--MMRP GPO Technical Memorandum 1of2--SEP2008
5005--RI--MMRP GPO Technical Memorandum 2of2--SEP2008

5006--RI--Geophysical Investigation Letter Work Plan Addendum--SEP2008
5007--RI--MMRP Public Notice--OCT2008
5008--RI--MMRP Intrusive Investigation Letter Work Plan Addendum--MAY2009

5009--RI--MMRP RI 1of5--JUN2011
5009--RI--MMRP RI 2of5--JUN2011
5009--RI--MMRP RI 3of5--JUN2011
5009--RI--MMRP RI 4of5--JUN2011
5009--RI--MMRP RI 5of5--JUN2011

5010--RI--MMRP Accident Prevention Plan--NOV2011
5011--RI--MMRP Fence Installation Work Plan--FEB2012
5013--RI--MMRP EE/CA Work Plan for the HSAR--MAY2012
5014--RI--MMRP EE/CA for the HSAR--APR2013
5014.1--RI--MMRP Action Memo for the HSAR--OCT2013

502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
5034--RI—Site-specific Worksheets for Operable Unit 5 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018

Feasibility Study (FS)

5012--FS--MMRP FS Amendment--NOV2012

Proposed Plan (PP)

5015--PP--Proposed Plan Public Meeting Notice--APR2013
5016--PP--MMRP Proposed Plan Public Meeting Minutes for the HSAR EE/CA--MAY2013
5017--PP--MMRP Proposed Plan--MAY2013

Record of Decision (ROD)

5018--ROD--MMRP ROD--SEP2014

Operable Unit 6 (OU6) - Onsite Groundwater

1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003

Preliminary Assessment (PA)

101--PA--Pollution Investigation for Pinkwater Lagoon, Line 6 and Line 4A 1of2--SEP1981
101--PA--Pollution Investigation for the Pinkwater Lagoon, Line 6 and Line 4A 2of2--SEP1981

102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices

103--PA--Underground Pollution Investigation--FEB1982
104--PA--Subsurface Investigation at Site Z-1 (Abandoned Pink Water Lagoon)--FEB1982
105--PA--Follow-on Study of Environmental Contamination--AUG1984
6000--PA--Groundwater QA Plan for the IDA and Line 6--JUN1985
107--PA--Midwest Site Confirmation Survey Sampling--AUG1986
6001--PA--Sampling and Analysis Plan-Quality Control-Quality Assurance Plan for the IDA and Line 6 Groundwater--MAR1988

6002--PA--Groundwater Quality Assessment for the IDA and Line 6 Areas 1of2--DEC1989
6002--PA--Groundwater Quality Assessment for the IDA and Line 6 Areas 2of2--DEC1989

108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
6003--PA--Monitoring Evaluation for the IDA and Line 6--JAN1992

6004--PA--Work Plan and Groundwater Quality Assessment Plan for Trench 5 and Line 6-1of2--OCT1993
6004--PA--Work Plan and Groundwater Quality Assessment Plan for Trench 5 and Line 6-2of2--OCT1993

111--PA--Technical Review Committee Minutes--MAY1993
6005--PA--Groundwater Assessment for Trench 5 and Line 6--MAY1994

6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-1of3--OCT1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-2of3--OCT1994
6006--PA--Accelerated Groundwater Quality Assessment for the Ash Disposal Cell in Trench 5 and Line 6-3of3--OCT1994

112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994

Site Inspection (SI)

200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993

6006.1--SI--Acute and Chronic Toxicity Tests-1of2--APR1993
6006.1--SI--Acute and Chronic Toxicity Tests-2of2--APR1993

6007--SI--Basewide Analytes and Drilling Procedures--MAY1993

Remedial Investigation (RI)

300--RI--Endangerment Assessment Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1of2--JUL1989
300--RI--Endangerment Assessment Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2of2--JUL1989

301--RI--Risk Assessment Protocol for the RI/FS--OCT1992

302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1--JUN1994
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2--JUN1994

6008--RI--Project Summary Report Technical Data Report for GW Monitoring--1of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--2of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--3of4-1995
6008--RI--Project Summary Report Technical Data Report for GW Monitoring--4of4-1995

303--RI--Field Sampling Plan Addendum--MAR1995
6009--RI--Fall 1995 Monitoring of IRP Wells--MAR1996
306--RI--Risk Assessment--MAY1996
6010--RI--Spring 1996 Monitoring of IRP Wells--SEP1996
308--RI--Explosives Removal from Groundwater Inflow through Systems Planted with Aquatic and Wetland Plants--DEC1996
309--RI--Screening of Aquatic and Wetland Plant Species for Phytoremediation of Explosives--JAN1997

6011--RI--Site Groundwater Investigation Fire Training Pit Work Plan and Sampling and Analysis Plan 1of2--APR1997
6011--RI--Site Groundwater Investigation Fire Training Pit Work Plan and Sampling and Analysis Plan 2of2--APR1997

310--RI--Multiple Removal Actions Transmittal of Radioactive Isotope Analytical Report--MAY1997
6012--RI--1996-1997 Monitoring of IRP Wells--AUG1997
6013--RI-1997 Monitoring of IRP Wells--SEP1997
313--RI--Quality Control Summary Report - Supplemental Groundwater RI--JAN1998
314--RI Multiple Removal Actions - Water Treatment Plant for Perched Water at the IDA--FEB1998
316--RI--Work Plan and Sampling and Analysis Plan - Supplemental RI Line 800 Pinkwater Lagoon--AUG1998
317--RI-Quality Control Summary Report - Supplemental RI Line 800 Pinkwater Lagoon--FEB1999

318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 1of2--MAR1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 2of2--MAR1999

319--RI--Recommendations for Additional RI Line 800 Pinkwater Lagoon--MAY1999
320--RI--Work Plan Addendum - Supplemental RI Line 800 Pinkwater Lagoon--SEP1999
321--RI--Long Term Monitoring Event Fall 1999-Spring 2000 Work Plan Addendum--NOV1999
323--RI--Long Term Monitoring Event Spring 2000 Work Plan Addendum--APRapr2000
6014--RI--Fall 1999 Long Term Monitoring Report--JUN2000

6015--RI-Quality Control Summary Report Fall 1999 Groundwater Monitoring Sampling Event 1of2--JUL2000
6015--RI-Quality Control Summary Report Fall 1999 Groundwater Monitoring Sampling Event 2of2--JUL2000

328--RI--Technical Memorandum Evaluation of Contaminant Sources to Surface Streams--JUL2001
6016--RI--Spring 2000 Groundwater Monitoring Report--OCT2000
6017--RI--Fall 2000 Groundwater Monitoring Results Summary--APR2001
6018--RI-Spring 2001 Groundwater Monitoring Work Plan Addendum--MAY2001

329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 1of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 2of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 3of3--JUL2001

331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 1of2--AUG2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 2of2--AUG2001

334--RI--Supplemental Groundwater RI 1of5--AUG2001
334--RI--Supplemental Groundwater RI 2of5--AUG2001
334--RI--Supplemental Groundwater RI 3of5--AUG2001
334--RI--Supplemental Groundwater RI 4of5--AUG2001
334--RI--Supplemental Groundwater RI 5of5--AUG2001

335--RI--Groundwater Monitoring Program--AUG2001
336--RI--Fall 2000-Spring 2001 Groundwater Monitoring Results Summary--AUG2001

339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002

340--RI--Facility Wide Work Plan for Groundwater--FEB2002

341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 1of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 2of6--FEB2002.
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 3of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 4of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 5of6--FEB2002
341--RI--Fall 2000 Spring 2001 Groundwater Monitoring Report 6of6--FEB2002

6019--RI--Spring 2002 Groundwater Monitoring Work Plan Addendum--MAY2002

345--RI--Line 800 Pinkwater Lagoon Groundwater Flow and Contaminant Flow and Trans Modeling Tech Memo--FEB2003

6020--RI-Initial Groundwater Analytical Results and Monitoring Well Locations Six Sites FS Data Collection 1of2--FEB2003
6020--RI-Initial Groundwater Analytical Results and Monitoring Well Locations Six Sites FS Data Collection 2of2--FEB2003

347--RI--2002 Groundwater Monitoring Report 1of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 2of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 3of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 4of5--AUG2003
347--RI--2002 Groundwater Monitoring Report 5of5--AUG2003

6021--RI--Initial Groundwater Analytical Results Six Sites FS Data Collection 1of2--SEP2003
6021--RI--Initial Groundwater Analytical Results Six Sites FS Data Collection 2of2--SEP2003

351--RI--2003 Groundwater Monitoring Report 1of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 2of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 3of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 4of5--DEC2004
351--RI--2003 Groundwater Monitoring Report 5of5--DEC2004

354--RI--2004 Groundwater Monitoring Report 1of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 2of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 3of4--JUL2005
354--RI--2004 Groundwater Monitoring Report 4of4--JUL2005

355--RI--2004-2005 Groundwater Sampling Report 1of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 2of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 3of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 4of5--DEC2005
355--RI--2004-2005 Groundwater Sampling Report 5of5--DEC2005

357.1--RI--Brush Creek SW and Sediment Investigation Work Plan--FEB2006

357--RI--Comprehensive Watersheds Evaluation Work Plan 1of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of3--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 3of3--DEC2006

6022--RI--Concentration Trends for Selected Wells and Parameters--AUG2007

358--RI--2006 Groundwater Sampling Report 1of3--FEB2009
358--RI--2006 Groundwater Sampling Report 2of3--FEB2009
358--RI--2006 Groundwater Sampling Report 3of3--FEB2009

359--RI--2007 Groundwater Sampling Report--FEB2009

6023--RI--On-site Groundwater Treatability Study Tech Memo--FEB2009

6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 1of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 2of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 3of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 4of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 5of6--MAY2011
6023.1--RI--Work Plan for Supplemental RI of GW and SW at Line 1, and Field Modification 6of6--MAY2011

6023.3--RI-Tech Memo and Work Plan Addendum for Line 1 Groundwater and SW 1of2--OCT2012
6023.3--RI--Tech Memo and Work Plan Addendum for Line 1 Groundwater and SW 2of2--OCT2012

502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
6036--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
6037--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018
6038--RI—Site-specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018
6039--RI—Site-specific Worksheets for Watersheds of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018
6040--RI—Site-Specific Worksheets for Operable Unit 6 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 4—JAN2019

6041--RI—Iron Bioreactor Treatability Study—APR2019
6042--RI—Iron Bioreactor Treatability Study and Experiment Basis of Design—AUG2019

Feasibility Study (FS)

401--FS--Groundwater Feasibility Study Report--DEC1997

403--FS--Interim Groundwater Feasibility Study Report-1of2--AUG1998
403--FS--Interim Groundwater Feasibility Study Report-2of2--AUG1998

404--FS--Evaluation of Natural Attenuation--OCT1999
6024--FS--Fire Training Pit, West Burn Pads Area, and East Burn Pads Area FS Data Collection Work Plan Add--OCT2002
6025--FS--Lines 2, 3 and 9 FS Data Collection Work Plan--OCT2002
405--FS--Line 800 Pinkwater Lagoon FS--FEB2003

6026--FS--Line 3 Groundwater Remedial Alternatives Analysis 1of2--JAN2004
6026--FS--Line 3 Groundwater Remedial Alternatives Analysis 2of2--JAN2004

6027--FS--Line 9 Groundwater Remedial Alternatives Analysis 1of2--JAN2004
6027--FS--Line 9 Groundwater Remedial Alternatives Analysis 2of2--JAN2004

6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 1of3--FEB2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 2of3--FEB2004
6028--FS--Line 2 Groundwater Remedial Alternatives Analysis 3of3--FEB2004

6029--FS--Fire Training Pit Groundwater Remedial Alternatives Analysis 1of2--MAY2004
6029--FS--Fire Training Pit Groundwater Remedial Alternatives Analysis 2of2--MAY2004

6030--FS--East Burning Pads Groundwater Remedial Alternatives Analysis 1of2--JUN2004
6030--FS--East Burning Pads Groundwater Remedial Alternatives Analysis 2of2--JUN2004

6031--FS--West Burn Pads Groundwater Investigation 1of2--JUN2004
6031--FS--West Burn Pads Groundwater Investigation 2of2--JUN2004

6032--FS--Treatability Study Test Plan for In-Situ Bio-gradation of On-Post Groundwater--APR2005

Operable Unit 7 (OU7) - Installation Wide

1--ALL--Federal Facilities Agreement--SEP1990
2.0--ALL--Community Relations Plan--MAY1991
2.1--ALL--Community Relations Plan Update--FEB2001
2.2--ALL--Community Involvement Plan Addendum FUSRAP Areas--FEB2011
2.3--ALL--Community Relations Plan Update--SEP2011
2.4--ALL--Community Involvement Plan--MAY2017
3--ALL--ATSDR Public Health Assessment Note of Explanation--DEC1999
4--ALL--ATSDR Health Consultation Note of Explanation--MAR2001
5--ALL--ATSDR Health Consultation Environmental Pathway Evaluation--DEC2003

Preliminary Assessment (PA)

100--PA--Installation Assessment--JAN1980

101--PA--Pollution Investigation for Pinkwater Lagoon, Line 6 and Line 4A 1of2--SEP1981
101--PA--Pollution Investigation for the Pinkwater Lagoon, Line 6 and Line 4A 2of2--SEP1981

102--PA--Contamination Geo-technical Reports--SEP1982
102--PA--Appendices

103--PA--Underground Pollution Investigation--FEB1982
104--PA--Subsurface Investigation at Site Z-1 (Abandoned Pink Water Lagoon)--FEB1982
105--PA--Follow-on Study of Environmental Contamination--AUG1984
107--PA--Midwest Site Confirmation Survey Sampling--AUG1986
108--PA--Potential Areas Concern Supplement--MAY1991
109--PA--News Release--AUG1991
110--PA--Conceptual Program Plan--SEP1991
111--PA--Technical Review Committee Minutes--MAY1993
112--PA--Preliminary Assessments for 43 IAAAP Sites--OCT1994
113--PA--Installation Environmental Assessment--OCT1995

Site Inspections (SI)

200--SI--Sampling and Analysis Plan Vol 2 Field Sampling Plan--JUN1991
201--SI--Sampling and Analysis Plan Vol 1 Quality Assurance Project Plan--JUL1991
202--SI--Site Inspection--JUN1992
203--SI--Preliminary Site Characterization Reports--MAR1993
204--SI--Site Characterization Report R01--MAR1993
205--SI--Site Characterization Report R02 R03--MAR1993
206--SI--Site Characterization Report R04-R11--MAR1993
207--SI--Site Characterization Report R12-R21--MAR1993
208--SI--Site Characterization Report R22-R30--MAR1993
209--SI--Site Assessment Project Plans--JUN2000
210--SI--Field Sampling Report--FEB2001

211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-1of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-2of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-3of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-4of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-5of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-6of7--SEP2004
211--SI-Historical Record Review for Line 6, Line 800, Central Test Area and Deactivation Furnance-7of7--SEP2004

Remedial Investigations (RI)

301--RI--Risk Assessment Protocol for the RI/FS--OCT1992

302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-1--JUN1994
302--RI--BHHERA for the Former Line 1 Impoundment and Line 800 Pinkwater Lagoon-2--JUN1994

303--RI--Field Sampling Plan Addendum--MAR1995

7007--RI--Field Investigation Report for Former Line 1 Impoundment and Line 800 Pink Water Lagoon Sampling--APR1995
7008--RI--Final Work Plan - Rapid Response Interim Removal Actions at the Pesticide Pit and Sumps--APR1995
7009--RI--Sampling and Analysis Plan for Rapid Response Interim Removal Actions at the Pesticide Pit and Explosive Contaminated Sumps--APR1995

304--RI--Engineering Evaluation/Cost Analysis for Three Removal Actions-1of2--MAY1995
304--RI--Engineering Evaluation/Cost Analysis for Three Removal Actions-2of2--MAY1995

305--RI--Implementation Proposal for Environmental Protection--FEB1996
7011--RI--Engineering Evaluation/Cost Analysis Study for the Fire Training Pit--MAY1996
306--RI--Risk Assessment--MAY1996
307--RI--Work Plan for Multiple Removal Actions at Line 1 Impoundment, Line 800 Lagoon and the Inert Disposal Area--AUG1996
7012--RI--Sampling and Analysis Plan for Treated Discharges of the Water Contained in the Line 800 Pink Water Lagoon--AUG1996
7013--RI--Wetland Borrow Assessment Report--AUG1996
7014--RI--Final Report Addendum for Transportation and Disposal and Other Activities at the Pesticide Pit and Explosive Contaminated Sumps--NOV1996
308--RI--Explosives Removal from Groundwater Inflow through Systems Planted with Aquatic and Wetland Plants--DEC1996
309--RI--Screening of Aquatic and Wetland Plant Species for Phytoremediation of Explosives--JAN1997
310--RI--Multiple Removal Actions Transmittal of Radioactive Isotope Analytical Report--MAY1997
311--RI--Work QA Plan Eco Risk Assessment Addendum--JUL1997
312--RI--Multiple Removal Actions - Construction Progress Photo--SEP1997
314--RI Multiple Removal Actions - Water Treatment Plant for Perched Water at the IDA--FEB1998
315--RI--Historical Eco Risk Assessment Addendum--MAR1998
7015--RI--Site Monitoring Reports for the Former Fuel Station--JUL1998
7016--RI--Final Work Plan, Final Sampling and Analysis Plan Addendum, Final Site Safety and Health Plan Addendum for the Fire Training Pit--JUL1998
316--RI--Work Plan and Sampling and Analysis Plan - Supplemental RI Line 800 Pinkwater Lagoon--AUG1998
317--RI-Quality Control Summary Report - Supplemental RI Line 800 Pinkwater Lagoon--FEB1999
7017--RI--Line 1 and 800 Phytoremediation Monitoring--FEB1999 and Phyoremediation Results--FALL1997

318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 1of2--MAR1999
318--RI-Analytical Data Report - Supplemental Groundwater RI Line 800 Pinkwater Lagoon 2of2--MAR1999

319--RI--Recommendations for Additional RI Line 800 Pinkwater Lagoon--MAY1999
320--RI--Work Plan Addendum - Supplemental RI Line 800 Pinkwater Lagoon--SEP1999

7018--RI--Site Monitoring Reports for the Former Fuel Station--JAN2000
324--RI--Modification to the SAP Eco Assessment--APR2000
7019--RI--Revised RBCA Tier 2 Report--MAY2000
325--RI--Eco Risk Round 2 Sampling--SEP2000
7020--RI--Site Monitoring Reports for the Former Fuel Station--NOV2000
7021--RI--Site monitoring Report for Former Fuel Station--DEC2000
327--RI--Eco Risk Assessment Screening Level--APR2001

329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 1of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 2of3--JUL2001
329--RI--Supplemental RI Report Line 800 Pinkwater Lagoon 3of3--JUL2001

331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 1of2--AUG2001
331--RI--Quality Control Summary Report Groundwater Monitoring Program Spring 2000 Sampling Event 2of2--AUG2001

332--RI--Development of Dose Estimation Models and Toxicity Reference Values Ecological Risk Assessment--AUG2001

333--RI--Screening Level Risk Assessment Eco (Text - Appendix A)--AUG2001
333--RI--Screening Level Risk Assessment Eco (Appendix B-J)--AUG2001

338--RI--Addendum to Screening Level Risk Assessment Ecological--DEC2001

339--RI--AO Construction Projects Sampling Work Plan 1of2--JAN2002
339--RI--AO Construction Projects Sampling Work Plan 2of2--JAN2002

342--RI--Technical Memorandums Numbers 1-4 for the Ecological Risk Assessment--APR2002
344--RI--Aerial Radiation Survey Work Plan--OCT2002
345--RI--Line 800 Pinkwater Lagoon Groundwater Flow and Contaminant Flow and Trans Modeling Tech Memo--FEB2003
346--RI--Aerial Radiological Survey--JUL2003
7022--RI--Supplemental Work Plan for the Fire Training Pit Removal Action--AUG2003
7023--RI--Report for the Investigation of the Tar-Like Substance Piles--SEP2003
7024--RI--Sampling and Reconnaissance of Brush Creek--JAN2004

348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 1-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 2-of-3--MAY2004
348--RI--Work Plan for UXO Survey at Line 6 and Central Test Area 3-of-3--MAY2004

349--RI--Technical Memo 5 BERA--JUL2004

349.1--RI--Soil Data Collection Work Plan 1of2--JUL2004
349.1--RI--Soil Data Collection Work Plan 2of2--JUL2004

350--RI--BERA Vol I and II 1of2--OCT2004
350--RI--BERA Vol I and II 2of2--OCT2004

352--RI--Line 6 and Central Test Area Mec Density Survey Report 1of2--MAY2005
352--RI--Line 6 and Central Test Area Mec Density Survey Report 2of2--MAY2005

353--RI--Soil Data Collection Report 1of6--MAY2005
353--RI--Soil Data Collection Report 2of6--MAY2005
353--RI--Soil Data Collection Report 3of6--MAY2005
353--RI--Soil Data Collection Report 4of6--MAY2005
353--RI--Soil Data Collection Report 5of6--MAY2005
353--RI--Soil Data Collection Report 6of6--MAY2005

356--RI--Supplemental RI Work Plan 1of4--MAY2006
356--RI--Supplemental RI Work Plan 2of4--MAY2006
356--RI--Supplemental RI Work Plan 3of4--MAY2006
356--RI--Supplemental RI Work Plan 4of4--MAY2006

357.1--RI--Brush Creek Surface Water and Sediment Investigation Work Plan--FEB2006

357--RI--Comprehensive Watersheds Evaluation Work Plan 1of2--DEC2006
357--RI--Comprehensive Watersheds Evaluation Work Plan 2of2--DEC2006

7025--RI--Progress Report for Brush Creek--JUL2008
7025--RI--Supplemental Remedial Investigation Rev 3 (Text)--AUG2011

502--RI—Executive Summary Uniform Federal Policy-Quality Assurance Project Plan Packet 1—DEC2017
7044--RI—Site-specific Worksheets for Operable Unit 7 of the Uniform Federal Policy-Quality Assurance Project Plan Packet 2—APR2018

7045--RI—Site-specific Worksheets for Unassigned Sites of the Uniform Federal Policy-Quality Assurance Project Plan Packet 3—JUL2018

Feasibility Study (FS)
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-1of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-2of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-3of4--JUN1994
7026--FS--Former Line 1 Impoundment and Line 800 Pink Water Lagoon Feasibility Study-4of4--JUN1994

7027--FS--Evaluation of Treatment Alternatives for Line 1 Impoundment and Line 800 Pink Water Lagoon--JUN1995
7028--FS--Bench Scale Composting Investigation for Line 1 Impoundment and Line 800 Pink Water Lagoon--NOV1997
404--FS--Evaluation of Natural Attenuation--OCT1999
7029--FS--Options for Corrective Action Design Report for Former Fuel Station--JUL2001
405--FS--Line 800 Pinkwater Lagoon FS--FEB2003

7030--FS--Brush Creek Point Source Control Work Plan-1of2--NOV2004
7030--FS--Brush Creek Point Source Control Work Plan-2of2--NOV2004

7031--FS--Brush Creek Point Source Control Treatment System Design (Text)--MAY2005
7032--FS--Technical Memorandum Cesium Source Evaluation--FEB2009
7033--FS--Brush Creek Point Source Control Treatment System Report--JUN2009
7033.1--FS--Work Plan for Feasibility Study Supplemental Data Collection--JUL2013

Operable Unit 8 (OU8) - FUSRAP

The Formerly Utilized Sites Remedial Action Program (FUSRAP) has the mission of protecting public health and the environment by removing low-level radioactive contamination generated by activities of the Manhattan Engineer District and the Atomic Energy Commission (MED/AEC) during the development of atomic weapons in the 1940s and 1950s. FUSRAP has a separate Federal Facility Agreement Under CERCLA Section 120, Administrative Docket Number: CERCLA-07-2005-0378.
http://www.mvs.usace.army.mil/Missions/Centers-of-Expertise/Formerly-Utilized-Sites-Remedial-Action-Program/Iowa-FUSRAP-Administrative-Record/

Operable Unit 9 (OU9) - Construction Debris Sites
RAB Meeting Minutes

2019 RAB Meeting Minutes

8106--RAB-Meeting-Minutes--JUL2019
8105--RAB-Meeting-Minutes--APR2019
8104--RAB-Meeting-Minutes--JAN2019

2018 RAB Meeting Minutes

8103--RAB-Meeting-Minutes--OCT2018
8102--RAB-Meeting-Minutes--JUL2018
8101--RAB-Meeting-Minutes--APR2018
8100--RAB-Meeting-Minutes--JAN2018

2017 RAB Meeting Minutes

8099--RAB-Meeting-Minutes--OCT2017
8098--RAB-Meeting-Minutes--JUL2017
8097--RAB-Meeting-Minutes--APR2017
8096--RAB-Meeting-Minutes--JAN2017

2016 RAB Meeting Minutes

8095--RAB-Meeting-Minutes--OCT2016
8094--RAB-Meeting-Minutes--JUL2016
8093--RAB-Meeting-Minutes--APR2016
8092--RAB-Meeting-Minutes--JAN2016

2015 RAB Meeting Minutes

8091--RAB-Meeting-Minutes--OCT2015
8090--RAB-Meeting-Minutes--JUL2015
8089--RAB-Meeting-Minutes--APR2015
8088--RAB-Meeting-Minutes--JAN2015

2014 RAB Meeting Minutes

8087--RAB-Meeting-Minutes--OCT2014
8086--RAB-Meeting-Minutes--JUL2014
8085--RAB-Meeting-Minutes--APR2014
8084--RAB-Meeting-Minutes--JAN2014

2013 RAB Meeting Minutes

8083--RAB-Meeting-Minutes--OCT2013
8082--RAB-Meeting-Minutes--JUL2013
8081--RAB-Meeting-Minutes--APR2013
8080--RAB-Meeting-Minutes--JAN2013

2012 RAB Meeting Minutes

8079--RAB-Meeting-Minutes--OCT2012
8078--RAB-Meeting-Minutes--JUL2012
8077--RAB-Meeting-Minutes--APR2012
8076--RAB-Meeting-Minutes--JAN2012

2011 RAB Meeting Minutes

8075--RAB-Meeting-Minutes--OCT2011
8074--RAB-Meeting-Minutes--JUL2011
8073--RAB-Meeting-Minutes--APR2011
8072--RAB-Meeting-Minutes--JAN2011

2010 RAB Meeting Minutes

8071--RAB-Meeting-Minutes--OCT2010
8070--RAB-Meeting-Minutes--JUL2010
8069--RAB-Meeting-Minutes--APR2010
8068--RAB-Meeting-Minutes--JAN2010

2009 RAB Meeting Minutes

8067--RAB-Meeting-Minutes--OCT2009
8066--RAB-Meeting-Minutes--JUL2009
8065--RAB-Meeting-Minutes--JAN2009

2008 RAB Meeting Minutes

8064--RAB-Meeting-Minutes--AUG2008
8063--RAB-Meeting-Minutes--APR2008
8062--RAB-Meeting-Minutes--JAN2008

2007 RAB Meeting Minutes

8061--RAB-Meeting-Minutes--OCT2007
8060--RAB-Meeting-Minutes--JUL2007
8059--RAB-Meeting-Minutes--APR2007
8058--RAB-Meeting-Minutes--JAN2007

2006 RAB Meeting Minutes

8057--RAB-Meeting-Minutes--OCT2006
8056--RAB-Meeting-Minutes--JUL2006
8055--RAB-Meeting-Minutes--MAY2006
8054--RAB-Meeting-Minutes--MAR2006
8053--RAB-Meeting-Minutes--JAN2006

2005 RAB Meeting Minutes

8052--RAB-Meeting-Minutes--OCT2005
8051--RAB-Meeting-Minutes--AUG2005
8050--RAB-Meeting-Minutes--MAY2005
8049--RAB-Meeting-Minutes--JAN2005

2004 RAB Meeting Minutes

8048--RAB-Meeting-Minutes--NOV2004
8047--RAB-Meeting-Minutes--SEP2004
8046--RAB-Meeting-Minutes--MAY2004
8045--RAB-Meeting-Minutes--MAR2004
8044--RAB-Meeting-Minutes--JAN2004

2003 RAB Meeting Minutes

8043--RAB-Meeting-Minutes--NOV2003
8042--RAB-Meeting-Minutes--AUG2003
8041--RAB-Meeting-Minutes--MAY2003
8040--RAB-Meeting-Minutes--MAR2003

2002 RAB Meeting Minutes

8039--RAB-Meeting-Minutes--NOV2002
8038--RAB-Meeting-Minutes--SEP2002
8037--RAB-Meeting-Minutes--MAY2002
8036--RAB-Meeting-Minutes--MAR2002
8035--RAB-Meeting-Minutes--JAN2002

2001 RAB Meeting Minutes

8034--RAB-Meeting-Minutes--NOV2001
8033--RAB-Meeting-Minutes--AUG2001
8032--RAB-Meeting-Minutes--MAY2001
8031--RAB-Meeting-Minutes--MAR2001
8030--RAB-Meeting-Minutes--JAN2001

2000 RAB Meeting Minutes

8029--RAB-Meeting-Minutes--SEP2000
8028--RAB-Meeting-Minutes--JUL2000
8027--RAB-Meeting-Minutes--MAY2000
8026--RAB-Meeting-Minutes--MAR2000
8025--RAB-Meeting-Minutes--FEB2000
8024--RAB-Meeting-Minutes--JAN2000

1999 RAB Meeting Minutes

8023--RAB-Meeting-Minutes--DEC1999
8022--RAB-Meeting-Minutes--OCT1999
8021--RAB-Meeting-Minutes--SEP1999
8020--RAB-Meeting-Minutes--JUL1999
8019--RAB-Meeting-Minutes--JUN1999
8018--RAB-Meeting-Minutes--MAY1999
8017--RAB-Meeting-Minutes--APR1999
8016--RAB-Meeting-Minutes--MAR1999
8015--RAB-Meeting-Minutes--FEB1999
8014--RAB-Meeting-Minutes--JAN1999

1998 RAB Meeting Minutes

8013--RAB-Meeting-Minutes--SEP1998
8012--RAB-Meeting-Minutes--AUG1998
8011--RAB-Meeting-Minutes--JUL1998
8010--RAB-Meeting-Minutes--JUN1998
8009--RAB-Meeting-Minutes--MAY1998
8008--RAB-Meeting-Minutes--APR1998
8007--RAB-Meeting-Minutes--MAR1998
8006--RAB-Meeting-Minutes--FEB1998
8005--RAB-Meeting-Minutes--JAN1998

1997 RAB Meeting Minutes

8004--RAB-Meeting-Minutes--NOV1997
8003--RAB-Meeting-Minutes--OCT1997
8002--RAB-Meeting-Minutes--SEP1997
8001--RAB-Meeting-Minutes--AUG1997
8000--RAB-Meeting-Minutes--JUN1997

Five-Year Review Reports (5YR)
Mathes Lake - Operable Unit Undetermined
TNT Cave Complex - Operable Unit Undetermined